Bahrain drains to be filled in with concrete for F1 2024’s first race

The three-day test at the Sakhir International Circuit has been stopped twice due to the drain cover on the approach to the track’s Turn 11 coming loose.This is due to the powerful underfloor aerodynamics of the new ground-effect machines straining drains and their concrete surrounds as the cars pass over them at certain points.At this particular point of the Bahrain track, the racing line the …Keep reading

Läs mer…

kommentarer

Författare: Auto Motor & Sport

Källa: https://www.autosport.com/rss/feed/all